7/27/2010 - 11:43am  |  Last - 0.05  |  Volume - 0   |  Day High - 0.05
2010
2009
2008
2007
2006
2005

Goldex Drills 5.85m of 4.86 gpt Gold at the El Pato Project, Guatemala


January 23, 2007

Goldex Resources Corporation (TSX-V: GDX) (http://www.goldex.ca ) is pleased to announce results from the first two drill holes completed at its El Pato project, Guatemala.

Drill holes GDX-01 and GDX-02 were drilled in the area of previous drilling by the United Nations and the DGM (Guatemala Government Ministry of Mines) during the period 1985 through 1991. This area, referred to as the Principle Sectors, consists of a zone of low-angle planar silicified shear structures hosted in a regional granitic batholith.

Four target areas or “sectors” make up the zone and from west to east are named Agua Zarca, Cerrito West, Cerrito and Quebrada El Roque. The Goldex drill sites were selected based on results of the earlier drilling and are designed to text within blocks of mineralization as defined by the United Nations. An interactive drill hole map showing the completed and planned Goldex drill sites and all previous U.N and DGM drilling can be viewed on the Goldex website at (http://www.goldex.ca ).
In the Quebrada El Roque sector, GDX-01 confirmed the presence of mineralization between DGM holes PD-15, PD-19 and 20A. Results of the previous drilling and Goldex GDX-01 are shown in the table below.

In the Cerrito sector, GDX-02 confirmed the presence of mineralization within the block defined by U.N. holes DHP-14, DHP-15 and DHP-17. Results of the previous drilling and Goldex hole GDX-02 are shown in the table below.

These drill results are the first of numerous holes to be released over the following weeks and months.

Summary Table of Drill Hole Mineralization

Quebrada El Roque Sector
Drill Hole ID from to interval (m) Au g/T
Past Drill Program
PD-15 24.87 25.72 0.85 6.07
PD-19 36.46 37.22 0.76 22.41
PD-19 40.77 42.06 1.29 10.51
PD-20A 52.06 53.87 1.81 20.81
Goldex Drill Program
GDX-01 33.45 34.30 0.85 6.02
GDX-01 132.60 134.10 1.50 7.06
(new discovery vein )
Cerrito Sector
Drill Hole ID from to interval (m) Au g/T
Past Drill Program
DHP-14 30.45 34.20 3.75 5.36
DHP-15 21.00 21.75 0.75 25.20
DHP-17 6.00 6.60 0.60 16.05
Goldex Drill Program
GDX-02 14.00 15.00 1.00 4.60
GDX-02 69.50 75.35 5.85 4.86

Analytical work for the current exploration program is being done by BSI Inspectorate of Reno, Nevada an ISO certified lab, and all samples are delivered to the BSI sample preparation lab in Guatemala City by Goldex geologists.

The qualified person for Goldex is Richard W. Bybee P.Geo. who is responsible for the verification and quality assurance of the data set forth in this release.

Goldex Resources Corporation
Submitted on behalf of the board of directors
“Richard Bybee” P.Geo.,

Goldex’s web site can be accessed at http://www.goldex.ca/ .
For more information, please contact:

Jay Friesen
Manager Corporate Development

Mark Chadwick-Investor Relations
Tel.: (604) 669-4300
Email: mark@goldex.ca

The TSX Venture Exchange has neither approved nor disapproved the contents hereof and does not accept responsibility for the adequacy or accuracy of this release.


PRINT  |  EMAIL

International 1 866 509 4653
Local 604 689 9912
info@goldex.ca

Copyright Goldex Resources Corporation 2003-2008.
Site Designed and powered by Blender Media